Skip to content
Our website will be unavailable from 17:00 GMT Wednesday 20 November until 9:00 GMT Monday 25 November while we carry out important upgrades.

If you plan to update your membership, book an event or access APM Learning, APM Community or use other resources, please do this outside of these dates.

The 15 November Chartered Project Professional submission date is unaffected.

Thank you for your patience.
Added to your CPD log

View or edit this activity in your CPD log.

Go to My CPD
Only APM members have access to CPD features Become a member Already added to CPD log

View or edit this activity in your CPD log.

Go to My CPD
Added to your Saved Content Go to my Saved Content

Sarah De Boer, Centrica

Young project professional of the year: 2015

Imagine having to clear a blocked well in the deep waters of the North Sea in winter safely and with huge amounts of money at stake.

That was the challenge facing Sarah De Boer from operator Centrica when the flow of oil from a well in the Chestnut Field declined steeply. A build-up of scale had slowed the flow to the floating production, storage and offloading (FPSO) vessel, Hummingbird.

The well had to be shut in to prevent further scaling, losing nearly 2,000 barrels of the field’s daily production. The only other oil-producing well on the field was also shut in awaiting treatment to prevent scaling, leaving Hummingbird with no incoming production but very high running costs.